Match the scope to each location
Start with truck and trailer counts, vehicle types, installed technology and the work required at each depot. Confirm vehicle availability, route schedules, site access and operating windows with local contacts.
GPS, TELEMATICS & CAMERA SYSTEMS
Coordinate GPS, telematics and camera installations across the trucks, trailers and locations that keep your distribution operation moving.
One call connects equipment preparation, field scheduling, qualified technicians and documented QC through a dedicated Safety Net Installations project team.
Nationwide field support across all 50 states.

PLAN AROUND THE DISTRIBUTION SCHEDULE
Your fleet team provides the operating requirements. SNI connects equipment readiness, site schedules and field assignments so the rollout has one point of coordination.
Start with truck and trailer counts, vehicle types, installed technology and the work required at each depot. Confirm vehicle availability, route schedules, site access and operating windows with local contacts.
Denton warehousing supports serialized inventory, vehicle-specific kits and equipment distribution. Connect the hardware and installation materials with the vehicle mix and location schedule.
A dedicated Project Manager and Scheduling Coordinator organize regional technicians and customer-site communication. Technicians complete theory and hands-on installation qualification through SNI’s Denton training process.
Real-time photo QC supports review of required installation evidence. Daily Command Center reporting shows completed work, missed vehicles and outstanding items for the project team to follow through.
ONE INDIVIDUAL DEPLOYMENT
One nationwide project · One year
A food and beverage fleet equipped with GPS, camera, rear-camera and monitor systems across 50,000 trucks and trailers in a single deployment.
SNI managed equipment storage and distribution, field coordination, installation documentation and QC. The count and one-year duration describe this individual project only.
Customer identity and location-level records remain confidential.
Explore this deployment ↗DEFINE THE SYSTEMS BEFORE THE ROLLOUT
Trucks and trailers can need different equipment and installation steps. Define the approved hardware, vehicle connections, mounting requirements and completion checks for each part of the fleet.
SEE THE EVIDENCE
Installation records connect equipment identifiers, mounting and wiring photos, required functional checks and completion notes. The evidence follows the technology and the agreed project requirements.
Explore separate anonymized field examples or download the one-page standard-camera extract to share internally.
BEFORE THE FIRST SITE
Approximate counts and target windows are enough to start a discussion. The installation plan develops around your actual fleet and operating requirements.
Yes. Share counts, vehicle types, technology and locations so the scope and equipment requirements can be defined for each part of the fleet. SNI coordinates regional technicians and equipment distribution across all 50 states.
Provide route operating windows, vehicle availability and site contacts. SNI’s project management and scheduling team coordinates the installation timetable with each location and reports missed vehicles and work still to be scheduled.
Bring approximate truck and trailer counts by location, the platform and hardware, the installation scope, target dates and any site-access requirements. Note which details are still being defined.
SNI Protect coordinates troubleshooting, field service, equipment logistics and QC verification. Monitoring depends on authorized platform access and available capabilities; coverage is defined in your service agreement.
Explore SNI Protect ↗Yes. Use the provider inquiry form to share the platform, expected volume, regions and installation or aftercare needs for your customer program.
Discuss a technology-provider program ↗START WITH YOUR DISTRIBUTION FLEET